On August 24, French September 30 megawatts of tender will build offshore wind power base, wind power base will be built in the Loire Valley, the bulietani north, more than LangKe commercialised - far and Normandy coastal, bend and bend around senna to avoid damage SuoMa scenery and shipping. 3,000 mw nuclear power generation capacity equivalent to two EPR turbine. She introduced the French energy and about 150 million investment - 200 million euros. The large wind base construction cycle is long, the first batch of wind power 2015-it would be installed after the second half. The large wind base construction ZhongBiaoZhe sure need at least half a year 2004, France was tender sea wind power base construction.
|