中文 English  
Keywod:
    
 
 
 
Tel   : 400-818-1213
Fax   : 010-61538001
E-mail: Pursma@Pursma.com
 
Home > News > Industry News > The highest long-term development objectives of nuclear power will reach 100 million kilowatts
The highest long-term development objectives of nuclear power will reach 100 million kilowatts

In the recently held "The Third Summit of Chinese energy strategy and the environment", the National Deputy Minister of Environmental Protection, the National Nuclear Safety Administration Li Ganjie said that nuclear power development plan will soon be launched, planning target to reach 100 million kilowatts maximum .
Development of nuclear power in China in 2007 and long-term development plans, plans to build by 2020, 40 million kilowatts of nuclear power. "It appears that the planning goals set too low, and the actual demand and we want to achieve a considerable gap, it must adjust." Dry Li Jie said that nearly two-year lead in the Bureau of Energy Development and Reform Commission, the nuclear power development Planning has been conducting certification, revision, may soon be introduced to.

As to the specific planning objectives, Li Chien-Jie said, there are three views, one is built 70 million kilowatts, the other is built 80 million kilowatts, the third for the completion of 100 million kilowatts. Duiyu these three kinds of views, his view, "100 million kilowatts Dekenengxing small, Yin Wei Zai nuclear Fazhanguocheng we still are some short-Ban, bottlenecks, Biru overall skills shortages, equipment manufacturing, operation Guan Li's Nenglihuanbu is very and strong. It is not easy, and requires a process. Therefore, the possibility of the first two bigger better. "Moreover, he added, may also be pre-determined lower, conditional and come faster than the actual goal reached expectations high.
 
Copy right: Beijing prisma Electric Technology co.Ltd
Add: Meter 100 west Tianjiafu village Taihu town Tong zhou district Beijing
P.C:101116 Tel:400-818-1213 Fax:010-61538001